The plan is to install a 33 wind turbine park with a total capacity of 49,5 MW.
China Industrial Biotechnology Network, November 14, 2013
The plan is to install a 33 wind turbine park with a total capacity of 49,5 MW.
China Industrial Biotechnology Network, November 14, 2013